Private home · 2025
Kensington One-Bed Apartment
A complete refurbishment of a one-bedroom apartment over three months. The floors were lifted, acoustic underlay laid throughout, and new flooring run across the whole flat.
Specification
- Location
- Kensington, SW7
- Scope
- One-bed apartment complete refurb
- Duration
- 3 months
- Key works
- Lifted floors, acoustic underlay, flooring throughout
- Key materials
- Oak flooring, dark walnut joinery, large-format tile
From start to finish
01 / 02
Before
The floors were lifted back to the joists to install acoustic underlay throughout. Plumbing, electrics and the new floor build-up were all set out and insulated before the finish flooring went down.
02 / 02
Completion
New flooring runs continuously through the living room, kitchen, bedroom and bathroom. Joinery, lighting and sanitaryware were all set out on the same drawings, so every junction was resolved before the finish work began.
Next project
Finchley Rear Extension